Vacuubrand PC 3012 VARIO User Manual Page 55

  • Download
  • Add to my manuals
  • Print
  • Page
    / 75
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 54
Documents are only to be used and distributed completely and unchanged. It is strictly the users’ responsibility to check carefully
the validity of this document with respect to his product. Manual-no.: 999164 / 19/05/2009
page 55 of 75
Replacing diaphragms and valves
All bearings are encapsulated and are lled with long-life lubricant. Under normal
operating conditions, the pump is maintenance free. The valves and diaphragms are
wear parts. If the rated ultimate vacuum is no longer achieved or in case of increased
noise level, the pump interior, the diaphragms and the valves must be cleaned and
the diaphragms and valves must be checked for cracks or other damage. Depend-
ing on individual cases it may be efcient to check and clean the pump heads on a
regular basis. In case of normal wear the lifetime of the diaphragms and valves is >
10000 operating hours.
- Prevent internal condensation, transfer of liquids or dust. The diaphragm and
valves will be damaged, if liquids are pumped in signicant amount.
If the pump is exposed to corrosive gases or vapour or in case of deposits, mainte-
nance should be carried out frequently.
- Regular maintenance will improve the lifetime of the pump and also protect both
man and environment.
Ensure that maintenance is done only by suitable trained and supervised techni-
cians.
Ensure that the pump cannot be operated accidentally. Never operate the pump
if covers or other parts of the pump are disassembled. Never operate a de-
fective or damaged pump.
Before starting maintenance isolate the pump from the electrical supply and
wait two minutes after isolating the equipment from mains to allow the capaci-
tors to discharge. Avoid the release of pollutants. Allow sufcient cooling of the
pump.
Attention: The pump might be contaminated with the process chemicals that have
been pumped during operation. Ensure that the pump is decontaminated before
maintenance and take adequate precautions to protect people from the effects
of dangerous substances if contamination has occurred. Ensure that the mainte-
nance technician is familiar with the safety procedures which relate to the prod-
ucts processed by the pumping system.
Wear appropriate safety-clothing when you come into contact with contaminated
components. Avoid the release of pollutants.
Before starting maintenance vent the pump and isolate it from the vacuum system.
Please read section ”Replacing diaphragms and valves” completely before
starting maintenance.
Partially the pictures show pumps in other versions. This doesn’t inuence replacing diaphragms and
valves of the pump.
Set of seals for ME 4C NT VARIO ..............................................................................................696864
Set of seals for MZ 2C NT VARIO / PC 3002 VARIO ..................................................................696869
Set of seals for MD 4C NT VARIO / PC 3003/3004 VARIO .........................................................696870
Set of seals for MV 10C VARIO-B / MD 12C VARIO-B / PC 301x VARIO .................................696821
Diaphragm key (w/f 66) ............................................................................................................... 636554
NOTICE
NOTICE
Page view 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 74 75

Comments to this Manuals

No comments